Zimmermann Achieves 80% Faster Solar Design with PVcase
Zimmermann, a German solar tracker and mounting system company, achieved an 80% faster solar design process and 50% reduction in execution time by integrating PVcase with AutoCAD, enabling new team members to work independently within two weeks and enhancing project performance with features like the 'garden plant' for optimal tracker alignment on varied slopes.
How Zimmermann achieved 80% faster design processes with PVcase
Zimmermann transformed AutoCAD into a solar design powerhouse with PVcase — enabling 50% faster execution time.
![]()
Customer
Zimmermann
Location
Germany
Industry
Solar tracker and mounting system solutions
Employees
60+
Key results
80%
faster design processes
2weeks
for new team members to work independently
50%
decrease in execution time
The Customer
Learn more about Zimmermann PV-Tracker
Since 2017, Zimmermann PV-Tracker has provided high-quality substructures for ground-mounted solar projects across 10 countries, delivering over 500 MW of solar energy. Their expertise in mounting solutions, terrain analysis, and tracker systems continues to drive innovation in renewable energy.
How Zimmermann cuts design time by 80% with PVcase - YouTube
Tap to unmute
Since 2017, Zimmermann PV-Tracker has provided high-quality substructures far ground-mounted solar projects across 10 countries, delivering over 500 Mp of solar energy. Their expertise in mounting solutions, terrain analysis, and tracker systems continues to drive innovation in renewable energy.
”We worked with PVcase to develop a 'garden plant' feature that keeps all tracker strings sun-facing on varying slopes, giving our clients a significant performance edge.”
Hannes Elsen
Engineering Team Lead

The Challenge
Manual AutoCAD workflows slowed solar design at scale
As demand for solar projects grew, Zimmermann PV-Tracker engineering team faced major challenges: manual workflows, difficulties designing on complex terrain, and slower client response times.
Time-consuming manual tasks
Engineers spent hours calculating pole lengths and adjusting layouts within AutoCAD. This slowed down project timelines and limited capacity for new bids.
Struggles with undulating terrain
Manually adapting layouts to slopes often resulted in mismatched pole lengths and stability risks during construction.
Slow client turnaround
The manual repetition of design steps made it harder to deliver quick feedback and adapt to client requirements in real time.

![]()
Ground Mount
Design construction-ready projects 90% faster. PVcase Ground Mount, built on AutoCAD, automates utility-scale solar design, adapting complex layouts to real-word terrain with unmatched accuracy.
The solution
Enabling faster delivery and higher-confidence PV layouts
Zimmermann adopted PVcase Ground Mount to streamline solar design directly within AutoCAD. As a powerful extension, PVcase enhanced their existing workflows and unlocked greater efficiency without leaving the familiar AutoCAD environment.
More precision in design
PVcase automated pole length calculations and terrain analysis directly in AutoCAD, providing accurate ramming depths and exact pole lengths for thousands of piles — critical for safe installations on varied slopes.
Automated workflows
Replacing repetitive manual steps with automation halved design time, allowing faster project iterations and quicker responses to client requests.
Custom innovation
Collaborating with PVcase, Zimmermann introduced a garden plant feature for tracker systems, ensuring optimal solar alignment even on uneven terrain.
Improved client interaction
Features such as slope checks, framing presets, and collision analysis gave engineers the ability to validate layouts quickly and provide clients with preliminary designs and material tables directly from AutoCAD.
Responsive support
PVcase’s support team enabled smooth onboarding, fast troubleshooting, and incorporated Zimmermann’s feedback into product updates.
”PVcase accelerated our design process and delivered precise pile information for undulating terrain, ensuring accurate ramming depths — crucial for both safety and project efficiency.”
Hannes Elsen
Engineering Team Lead

Results
Faster, more accurate solar design at scale
The strategic move of PVcase Ground Mount adoption unlocked 80% faster workflows, automated complex tasks, and improved collaboration — all while maintaining the precision and environment Zimmermann's team already knew.
80% faster design processes
Automation of pole length calculations and terrain analysis within AutoCAD cut design time dramatically, accelerating project delivery.
Faster iterations and adjustments
The automated workflows in PVcase enable for significantly quicker design iterations and adjustments directly within the familiar AutoCAD platform. Engineers can rapidly generate and refine multiple design scenarios, leading to an 80% boost in design efficiency and a faster response to client requests and project changes.
Greater accuracy in complex terrain
With precise pole lengths generated up front, on-site adjustments were minimized, ensuring stable and secure installations.
Enhanced client collaboration
Faster layouts and detailed material tables delivered through AutoCAD boosted client confidence and sped up approvals.
Competitive innovation
The garden plant tracker feature gave Zimmermann an edge in performance and flexibility across diverse terrains.
Simplified training
New engineers reached independence in just two weeks, thanks to PVcase’s intuitive interface layered seamlessly onto AutoCAD.
One seamless workflow in AutoCAD — from layout to construction-ready design
PVcase Ground Mount, as an AutoCAD plug-in, generates construction-ready designs and enables a continuous, efficient workflow within the Autodesk environment.
\
\
Customer stories\
\
How Ideematec achieved 3x faster layout production with PVcase \
\
January 19, 2026
\
\
Customer stories\
\
How New Leaf Energy cut solar project development time by 50% with PVcase \
\
June 3, 2025
\
\
Customer stories\
\
How RWE scales 100 MW+ solar projects with PVcase's surgical precision \
\
February 11, 2026




Unlock these results for your business today
With PVcase Ground Mount, Zimmermann turned AutoCAD into a solar design powerhouse — transforming manual tasks into fast, accurate workflows. Your team can too.
© 2026 PVcase
PRODUCT
SOLUTIONS
COMPARE
APPLICATIONS
RESOURCES
PRICING
COMPANY
© 2026 PVcase